The Brief - Top Hat
The client approached Allume with the challenge of reaching EPC B for every flat in their development. They had exhausted all reasonable measures when they discovered the SolShare.
With the SolShare they were able to specify the precise kWp associated to each flat. This fidelity enabled them to add exactly the right number of SAP points to each flat to achieve the goal of EPC Bs throughout the building for the lowest possible cost.
The client was extremely happy to be able to achieve the EPC B in a simple, low cost method.
System Details: 6 x SolShares connected to 90 flats
kWp per Flat: 0.5 - 1.6 kWp per flat.
Price per Flat: £750