With PAM Building’s pre-assembled solutions, you can save up to 60% of time spent on-site – not only saving you time but reducing labour costs.
Firstly, they will learn more about the vision of your project, to help advise which product would be the most beneficial for your project. Then they will design a stack bespoke to your project, which will be assembled, air-tested, and inspected in their Telford foundry.
They will then work closely with their distribution partners to plan the delivery of your stacks, around your project’s schedule to ensure you have everything you need, exactly when you need it.
They supply their stacks in purpose-made stillage designed for one-person handling, keeping them secure, providing robust storage and ease of movement around the site. Cast iron will give you an element of flexibility on-site which can’t be achieved from any other material, as their cast iron pipes are connected using couplings that can be adjusted allowing for onsite variances and retrospective changes to the system.
Not only will their bespoke design minimise wastage, but their systems are made of 99% recycled material and are 100% recyclable without degrading cast irons’ robust properties - helping lower your project’s impact on the environment.
For more information visit: https://www.pambuilding.co.uk/pre-assembly