Aggregate Industries have provided their asphalt for the world’s largest traditional sports car manufacturer as part of a refurbishment.
The refurbishment would see an additional 300 metres of driving space at its circuit to enhance the customer driving experience.
14,000 tonnes of type 1 subbase arrived over a three week period in January, a further 8,000 tonne delivery was sent over two weeks in February and a final 8,000 tonnes was delivered within a fortnight in March.
Once the subbase was successfully laid and compacted, Aggregate provided over 4000 tonne of 20mm dense binder course used to adhere a top layer of specifically formulated 10mm Prix-Mat.
Pre-mat has combined a uniform textured depth and high grip particle construction to deliver a highly durable surface suitable for high-performance motor vehicles.
To complement the new professional driving surface, a further 120 tonne of 10mm Superflex Poly Modified Binder was provided to complete a smaller car storage
View Asphalt Product Entry